Protectant fungicide Respray Dates for Secondary Scab Suppression

Background Information for this page
Return to radar list for Greenville RI
       This table estimates fungicide intervals for suppressing spread of secondary scab if it should occur.  Use the appropriate primary scab respray guidelines instead of this table until ascospore releases are completed.  Rules used to estimate protection depletion change after fruit set and again after terminal bud set.  See Background Information page for details.
      Brown text with grey background indicates dates when 2nd generation scab lesions from the final ascospore release have had time to begin appearing.  After this date it is possible to confirm the status of primary scab control.  If successful control of primary apple scab infections has been confirmed, this table is no longer needed, and fungicide application dates can be made with the extended intervals adequate to prevent flyspeck and other summer diseases. 
      But if there are enough active scab infections present to cause an unacceptable risk of fruit scab infection, this table provides estimates for respray dates to keep scab infections from spreading.  If active lesions are found, fungicide protection is needed until those lesions exhaust their supply of spores, which takes about 4 weeks. 
       Depending on scab severity, market sensitivity, temperature, and proximity to harvest; shorter or longer fungicide intervals to suppress spread from active scab lesions may be more appropriate than the estimates shown below.
      The estimated date for 95+% scab ascsopore release at this site is May 9.   
The estimated McIntosh fruit set date for this site is May 5. 
The approximate terminal bud set date for this site is June 23.
Weather data for Greenville RI.  Forecast values begin May 17, 2012
Previous
Spray Date

Estimates assume that fungicide
was applied BEFORE rain
on spray date
Inches Rain Protection End Date against Secondary Scab
for full-dose
captan, mancozeb or other protectant fungicide
Percent primary scab potential beginning to show as
(1st generation)
&
2nd gen. lesions by protection end date
Respray Deadline
= Start date for next scab infection period after protection ends
Tue,  May  8 0.20 May 11, Fri (74%) 1% May 15, Tue
Wed,  May  9 1.06 May 16, Wed (90%) 2% May 22, Tue
Thu,  May  10 0.75 May 21, Mon (98%) 74% May 22, Tue
Fri,  May  11 0 May 22, Tue (98%) 74% May 22, Tue
Sat,  May  12 0 May 23, Wed (98%) 74% Too early to estimate
Sun,  May  13 0 May 24, Thu (98%) 74%  
Mon,  May  14 0 May 25, Fri (98%) 89%  
Tue,  May  15 0.57 May 27, Sun (100%) 90%  
Wed,  May  16 0.58 May 28, Mon (100%) 90%  
Thu,  May  17 0 May 29, Tue 90%  
Fri,  May  18 0 May 30, Wed 90%  
Sat,  May  19 0 Too early 90%  
Sun,  May  20 0 Too early 98%  
Mon,  May  21 0 Too early   98%  
Tue,  May  22 0.41 Too early 98%  
Wed,  May  23 0.16 Too early 98%  
Thu,  May  24 0 Too early 98%  
Fri,  May  25  
Sat,  May  26  
Sun,  May  27  
Mon,  May  28          
Tue,  May  29  
Wed,  May  30  
Thu,  May  31  
Fri,  June  1  
Sat,  June  2  
Sun,  June  3  
Mon,  June  4          
Tue,  June  5  
Wed,  June  6  
Thu,  June  7  
Fri,  June  8  
Sat,  June  9  
Sun,  June  10  
Mon,  June  11          
Tue,  June  12  
Wed,  June  13  
Thu,  June  14  
Fri,  June  15  
Sat,  June  16  
Sun,  June  17  
Mon,  June  18          
Tue,  June  19  
Wed,  June  20  
Thu,  June  21  
Fri,  June  22  
Sat,  June  23  
Sun,  June  24  
Mon,  June  25          
Tue,  June  26  
Wed,  June  27  
Thu,  June  28  
Fri,  June  29  
Sat,  June  30  
Sun,  July  1  
Mon,  July  2          
Tue,  July  3  
Wed,  July  4  
Thu,  July  5  
Fri,  July  6  
Sat,  July  7  
Sun,  July  8  
Mon,  July  9          
Tue,  July  10  
Wed,  July  11  
Thu,  July  12  
Fri,  July  13  
Sat,  July  14  
Sun,  July  15  
Mon,  July  16          
Tue,  July  17  
Wed,  July  18  
Thu,  July  19  
Fri,  July  20  
Sat,  July  21  
Sun,  July  22  
Mon,  July  23          
Tue,  July  24  
Wed,  July  25  
Thu,  July  26  
Fri,  July  27  
Sat,  July  28  
Sun,  July  29  
Mon,  July  30          
Tue,  July  31  
Wed,  August  1  
Thu,  August  2  
Fri,  August  3  
Sat,  August  4  
Sun,  August  5  
Mon,  August  6          
Tue,  August  7  
Wed,  August  8  
Thu,  August  9  
Fri,  August  10  
Sat,  August  11  
Sun,  August  12  
Mon,  August  13          
Tue,  August  14  
Wed,  August  15  
Thu,  August  16  
Fri,  August  17  
Sat,  August  18  
Sun,  August  19  
Mon,  August  20          
Tue,  August  21  
Wed,  August  22  
Thu,  August  23  
Fri,  August  24  
Sat,  August  25  
Sun,  August  26  
Mon,  August  27          
Tue,  August  28  
Wed,  August  29  
Thu,  August  30  
Fri,  August  31